Algonquin Gas Transmission, LLC
Fifth Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 12/01/2009, Docket: RP10-146-000, Status: Effective
Fifth Revised Sheet No. 374 Fifth Revised Sheet No. 374
Superseding: Fourth Revised Sheet No. 374
RATE SCHEDULE AIT-2
INTERRUPTIBLE TRANSPORTATION SERVICE
5. OTHER OPERATING CONDITIONS
Algonquin's obligation to provide service under this rate schedule is subject to the
following conditions being satisfied:
5.1 Customer shall make all necessary arrangements with Algonquin or other parties, as
applicable, at or upstream of the Point(s) of Receipt where Customer tenders gas
to Algonquin for transportation, and at or downstream of the Point(s) of Delivery
where Algonquin delivers gas for Customer's account, and such arrangements must be
compatible with Algonquin's system operations.
5.2 To the extent that any upstream entity involved in handling Customer's gas refuses
or is unable to deliver gas to Algonquin, Algonquin shall not be required to
continue deliveries of gas on behalf of Customer. To the extent that any
downstream entity involved in handling Customer's gas refuses or is unable to
receive gas from Algonquin, Algonquin shall have the right to reduce deliveries of
gas on behalf of Customer.
5.3 The daily quantities of natural gas transported shall be delivered at the Point(s)
of Receipt and accepted at the Point(s) of Delivery at a substantially constant
hourly rate, or such other hourly rate as may be acceptable to Algonquin.
6. POINT(S) OF RECEIPT AND DELIVERY
6.1 All interconnections between the Brayton Point Lateral facilities, including, but
not limited to, the tap on Algonquin's G-1 System in Dighton, MA (M&R No. 80034);
the Manchester Street Lateral facilities, including, but not limited to the head
of the G-12 Lateral (M&R No. 80070); the Canal Lateral facilities, including, but
not limited to, the interconnection between the Canal Lateral and Algonquin's
mainline; the Cape Cod Lateral facilities, including, but not limited to, the
interconnection between the Cape Cod Lateral and the Canal Lateral; the Northeast
Gateway Lateral facilities, including, but not limited to, the interconnection
between the Northeast Gateway Lateral and the HubLine offshore system in
Massachusetts Bay, Massachusetts; the J-2 Facility, including, but not limited to
the head of the J-2 Facility (M&R No. 80094); or the Kleen Energy Lateral
facilities, including, but not limited to, the interconnection between the Kleen
Energy Lateral and the Middletown Lateral, as specified in Customer's executed
AIT-2 Service Agreement, and the facilities of other operators shall be available
for use by Customer as Point(s) of Receipt.
6.2 All interconnections between the Brayton Point Lateral facilities, including, but
not limited to, the tap on Algonquin's G-1 System in Dighton, MA (M&R No. 80034);
the Manchester Street Lateral facilities, including, but not limited to the head
of the G-12 Lateral (M&R No. 80070); the Canal Lateral facilities, including, but
not limited to, the interconnection between the Canal Lateral and Algonquin's
mainline; the Cape Cod Lateral facilities, including, but not limited to, the
interconnection between the Cape Cod Lateral and the Canal Lateral; the Northeast
Gateway Lateral facilities, including, but not limited to, the interconnection
between the Northeast Gateway Lateral and the HubLine offshore system in
Massachusetts Bay, Massachusetts; the J-2 Facility, including, but not limited to
the head of the J-2 Facility (M&R No. 80094); or the Kleen Energy Lateral
facilities, including, but not limited to, the interconnection between the Kleen
Energy Lateral and the Middletown Lateral, as specified in Customer's executed
AIT-2 Service Agreement, and the facilities of other operators shall be available
for use by Customer as Point(s) of Delivery.
7. GENERAL TERMS AND CONDITIONS
The applicable General Terms and Conditions of this FERC Gas Tariff are hereby made a
part of this rate schedule.