Algonquin Gas Transmission, LLC

Fifth Revised Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 12/01/2009, Docket: RP10-146-000, Status: Effective

Sixth Revised Sheet No. 208 Sixth Revised Sheet No. 208

Superseding: Fifth Revised Sheet No. 208

 

RATE SCHEDULE AFT-1

FIRM TRANSPORTATION SERVICE

 

6. POINT(S) OF RECEIPT AND DELIVERY

 

6.1 (A) Primary Points of Receipt: The Primary Point(s) of Receipt at which

Algonquin shall receive gas for transportation under this rate schedule shall

be specified in an exhibit to the service agreement executed by Algonquin and

Customer. Such exhibit shall specify for each Primary Point of Receipt the

MDRO and receipt pressure obligations. Such exhibit by mutual written

agreement may be superseded by a new exhibit which may add or delete specific

points or make other changes thereto that the parties deem appropriate.

Algonquin shall not accept any proposed Primary Point(s) of Receipt, or

quantity at any Primary Point(s) of Receipt, or change in quantities among

Primary Point(s) of Receipt if (a) the resulting aggregate MDROs at all of

Customer's Primary Point(s) of Receipt would exceed Customer's MDTQ, or (b)

in doing so, in Algonquin's reasonable judgment, Algonquin would impair its

ability to satisfy its existing firm obligations to receive gas pursuant to

other firm service agreements under which such Point(s) of Receipt are

Primary Points of Receipt and to purchase and receive its Company Use Gas at

maximum deliverability levels, as such Company Use Gas arrangements exist

under agreements effective at the date of Customer's request or reasonably

expected by Algonquin to be effective within six months of the request.

 

(B) A Replacement Customer that acquired capacity pursuant to the capacity

release mechanism set forth in Section 14 of the General Terms and Conditions

of this tariff or a releasing Customer that has released capacity pursuant to

the capacity release mechanism set forth in Section 14 of the GT&C of this

tariff may request, subject to the availability of point and path capacity,

any interconnection between the facilities of Algonquin and the facilities of

other operators for use as a Primary Point of Receipt in a segmented

transaction, provided, however, that Algonquin shall not accept any proposed

Primary Point of Receipt to the extent that (a) the resulting aggregate

contractual entitlements under the related releasing and replacement

contracts along any segment would exceed the MDTQ of the original contract,

or (b) the quantities transported along any segment under the resulting

aggregate related releasing and replacement contracts would exceed the MDTQ

of the original contract. In the event that Replacement Customer selects a

new Primary Point of Receipt that is located within the acquired contract

path, the portion of the path no longer covered by that contract is deemed to

be unsubscribed capacity that may be sold by Algonquin for the term of the

capacity release agreement. Upon termination of the capacity release

agreement, all capacity covered by the original release, including the

original Primary Points of Receipt, shall revert to the Releasing Customer,

and any Primary Points of Receipt granted during the term of the capacity

release agreement shall revert to Algonquin as unsubscribed capacity.

 

6.2 Secondary Points of Receipt: Notwithstanding the foregoing, all interconnections

between the facilities of Algonquin and the facilities of other operators shall be

available for use by Customer as Secondary Points of Receipt, with the exception

of interconnections with the facilities of other operators accessible only through

the utilization of capacity on the Brayton Point Lateral, the Manchester Street

Lateral, the Canal Lateral, the Cape Cod Lateral, the Northeast Gateway Lateral,

the J-2 Facility, or the Kleen Energy Lateral, as such lateral facilities are

defined in Rate Schedule AFT-CL; provided, however, that the interconnection

between the Brayton Point Lateral and Algonquin's mainline, the interconnection

between the Manchester Street Lateral and Algonquin's mainline, the

interconnection between the Canal Lateral and Algonquin's mainline, the

interconnection between the Northeast Gateway Lateral and the HubLine offshore

system in Massachusetts Bay, Massachusetts, the interconnection between the J-2

Facility and Algonquin's mainline, and the interconnection between the Middletown

Lateral and the Kleen Energy Lateral are available as Secondary Points of Receipt

under this Rate Schedule AFT-1. Such use of Secondary Points of Receipt is

subject to and pursuant to Section 48.2 of the General Terms and Conditions of

this FERC Gas Tariff.