Algonquin Gas Transmission, LLC
Fifth Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 10/01/2009, Docket: RP09-938-000, Status: Effective
Eighth Revised Sheet No. 24 Eighth Revised Sheet No. 24
Superseding: Seventh Revised Sheet No. 24
Rate Schedule AFT-1
Incremental Capacity Charges
Firm Transportation Service
CHARGES
$/dth
APPLICABLE TO CUSTOMERS UTILIZING CAPACITY PURSUANT TO INCREMENTAL
FACILITY EXPANSIONS AND IN ADDITION TO THE AFT-1 SYSTEM RATE: Maximum Minimum
1. Docket No. CP99-46 (EMI-Tiverton Project):
__________________________________________
Customer dth
_______________________________________________ _____
Calpine Energy Services LP 46,000
RESERVATION CHARGE 1.6424 0.0000
VOLUMETRIC RESERVATION CHARGE 0.0540 0.0000
2. Docket No. CP01-5 (HubLine Mainline):
HUBLINE CHARGE APPLICABLE TO CUSTOMERS CONTRACTED FOR TRANSPORTATION
PATH AND/OR UTILIZING PRIMARY RECEIPT AND/OR DELIVERY POINTS FROM
BEVERLY TO WEYMOUTH, AND IN ADDITION TO THE AFT-1 SYSTEM RATE:
Maximum Minimum
RESERVATION CHARGE 1.8607 0.0000
VOLUMETRIC RESERVATION CHARGE 0.0612 0.0000
USAGE 2/
CHARGES
$/dth
HUBLINE SURCHARGE APPLICABLE TO ALL CUSTOMERS UTILIZING SECONDARY RECEIPT
POINTS BETWEEN AND INCLUDING BEVERLY AND WEYMOUTH AND/OR UTILIZING SECONDARY
DELIVERY POINTS BETWEEN BEVERLY AND WEYMOUTH, INCLUDING BEVERLY AND
EXCLUDING WEYMOUTH, AND IN ADDITION TO OTHER APPLICABLE CHARGES:
Maximum Minimum
COMMODITY CHARGE 3/ 0.0612 0.0000
3. Docket No. CP06-76 (Ramapo Project):
APPLICABLE TO CUSTOMERS CONTRACTED FOR TRANSPORTATION SERVICE CHARGES
ON FACILITIES CONSTRUCTED UNDER THE RAMAPO PROJECT IN ADDITION $/dth
TO THE AFT-1 SYSTEM RATE:
Maximum Minimum
RESERVATION CHARGE 7.5608 0.0000
VOLUMETRIC RESERVATION CHARGE 0.2486 0.0000
AUTHORIZED OVERRUN CHARGE 0.2486 0.0000
1/ The Reservation Charge is the effective rate on file with the Commission excluding
adjustments approved by the Commission.
2/ Excludes ACA of $0.0019.
3/ HubLine surcharges applicable to both the Commodity and Authorized Overrun Charges.