American Midstream (AlaTenn), LLC

Fifth Revised Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 05/01/2010, Docket: RP10-493-000, Status: Effective

Original Sheet No. 129 Original Sheet No. 129

 

GENERAL TERMS AND CONDITIONS (continued)

 

3.8 Shipper's Request to Release Rate Schedule FT Capacity Rights

 

A "Releasing Shipper," including any Replacement Shipper that desires to make a

subsequent

release

as provided in Section 3.15 herein, is a Shipper that desires to release for a

minimum of one (1)

Day, its

rights in whole or in part to firm Transportation Service at any receipt or delivery

point on

Transporter's

system (provided that any release downstream of the Replacement Shipper's

primary delivery

point will

have a lower scheduling priority to all firm Shippers using that point as a Primary

Point(s))pursuant to

Rate Schedule FT, and unless otherwise exempt herein, who shall post to

Transporter's

Interactive

Internet Website prior to the applicable deadlines prescribed in Section 3.14, a

Release Request

containing the following information:

 

 

(a) Releasing Shipper's name and Transportation Service Contract Number;

 

(b) the Maximum Daily Quantity ("MDQ") expressed as Dth/Day to be released

(including any

minimum acceptable MDQ);

 

(c) the proposed commencement date and term of the release (including any

minimum

acceptable

term);

 

(d) the Primary Receipt Points and Primary Delivery Points for the released

service and the

amount of

the firm capacity to be released at each such point (the total Receipt Point

capacity released,

excluding

applicable fuel and losses shall be equal to the total Delivery Point capacity

released);