American Midstream (AlaTenn), LLC
Fifth Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 05/01/2010, Docket: RP10-493-000, Status: Effective
Original Sheet No. 129 Original Sheet No. 129
GENERAL TERMS AND CONDITIONS (continued)
3.8 Shipper's Request to Release Rate Schedule FT Capacity Rights
A "Releasing Shipper," including any Replacement Shipper that desires to make a
subsequent
release
as provided in Section 3.15 herein, is a Shipper that desires to release for a
minimum of one (1)
Day, its
rights in whole or in part to firm Transportation Service at any receipt or delivery
point on
Transporter's
system (provided that any release downstream of the Replacement Shipper's
primary delivery
point will
have a lower scheduling priority to all firm Shippers using that point as a Primary
Point(s))pursuant to
Rate Schedule FT, and unless otherwise exempt herein, who shall post to
Transporter's
Interactive
Internet Website prior to the applicable deadlines prescribed in Section 3.14, a
Release Request
containing the following information:
(a) Releasing Shipper's name and Transportation Service Contract Number;
(b) the Maximum Daily Quantity ("MDQ") expressed as Dth/Day to be released
(including any
minimum acceptable MDQ);
(c) the proposed commencement date and term of the release (including any
minimum
acceptable
term);
(d) the Primary Receipt Points and Primary Delivery Points for the released
service and the
amount of
the firm capacity to be released at each such point (the total Receipt Point
capacity released,
excluding
applicable fuel and losses shall be equal to the total Delivery Point capacity
released);