American Midstream (AlaTenn), LLC
Fifth Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 05/01/2010, Docket: RP10-493-000, Status: Effective
Original Sheet No. 54 Original Sheet No. 54
RATE SCHEDULE IT (continued)
Shipper's designee shown on Exhibit B to the IT Contract.
4.3 Transporter shall not be obligated to deliver gas pursuant to this Rate
Schedule to a Delivery
Point
that is operated by a Shipper that has entered into an FT-SG Contract with
Transporter unless
the FT-
SG Shipper and the IT Shipper have first complied with the provisions of Section
7 of
Transporter's FT-
SG Rate Schedule.
4.4 Transporter shall not be required under any circumstances to deliver gas to
any Delivery
Point(s)
where the total quantity of gas scheduled for delivery on any Day is less than that
required for
the
accurate measurement of quantities to be delivered.
4.5 Pressures: Shipper shall deliver gas to Transporter at the pressure required
from time to
time to
enable the gas to enter Transporter's facilities at the Receipt Point. Transporter
shall deliver gas
to
Shipper or Shipper's designee at Transporter's line pressure existing at the
Delivery Point(s).
4.6 Uniform Quantities: Shipper shall deliver and receive gas in uniform hourly
quantities
during any
Day with no significant fluctuation.
5. RATE
5.1 Applicable Rates: The rates for service under this Rate Schedule is the
applicable
Maximum IT
rate shown on the effective Tariff Sheet No. 4; provided, however, Transporter
has the right at
any time
and from time to time to adjust the rate applicable to any Transportation Service
upon notice to
Shipper
to any level not less than the Minimum or more than the Maximum Rates
established for this
Rate
Schedule as set forth on the effective Tariff Sheet No. 4.
Transporter shall file with the Commission the reports required under Section
284.7 of the
Commission's
Regulations for any adjustment below the Maximum Rates for service under this
Rate Schedule.