American Midstream (AlaTenn), LLC

Fifth Revised Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 05/01/2010, Docket: RP10-493-000, Status: Effective

Original Sheet No. 44 Original Sheet No. 44

 

RATE SCHEDULE FT-SG (continued)

 

 

Transporter may authorize, accept deliveries of gas at Delivery Point(s) shipped

pursuant to the

IT

Contract for redelivery to the qualified end-user.

 

7.3 Qualified end-users on whose behalf an FT-SG receives gas must have an

alternate fuel

supply or

alternate method of operations to satisfy total requirements for a minimum of five

consecutive

Days,

subject to verification by Transporter, during periods of curtailment.

 

7.4 Previously approved service pursuant to this Section 7 may be terminated,

on 60 Days

written

notice to the FT-SG Shipper, if the qualified end-user ceases to meet the

requirements of this

Section 7.

 

7.5 Transporter shall not be obligated to permit deliveries pursuant to this Section

7 if the

qualified end-

user is also using firm gas supplied from the Shipper's FT-SG Contract or if the

qualified end-

user's

facilities are installed in any manner to allow the substitution of FT-SG service for

IT service at

any time.

The qualified end-user's equipment will be subject to inspection at reasonable

intervals by

Transporter.

In the event that any such prohibitive substitutions have occurred or could occur,

Transporter

may

terminate its approval of service under this Section 7 on ten (10) Days written

notice to the FT-

SG

Shipper. Such termination is without prejudice to any other remedies Transporter

may have.

 

7.6 An FT-SG Shipper receiving interruptible transportation deliveries pursuant to

this Section 7,

shall

install, maintain, and operate, at its own expense, at or near the FT-SG Shipper's

Point of

Delivery to the

qualified end-user, a measuring station properly equipped with meters and other

measuring

equipment

satisfactory to Transporter, by which the daily volume of gas delivered by the FT-

SG Shipper to

each of

the qualified end-users receiving service under the provisions of this Section 7

can be accurately

determined. The quantity of gas to be billed under the IT Contract pursuant to

which the qualified

end-