American Midstream (AlaTenn), LLC
Fifth Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 05/01/2010, Docket: RP10-493-000, Status: Effective
Original Sheet No. 37 Original Sheet No. 37
RATE SCHEDULE FT-SG (continued)
4. DELIVERY AND RECEIPT POINTS; PRESSURE; UNIFORM QUANTITIES
4.1 Receipt Points: The Primary Receipt Point(s) for all gas transported by
Transporter under
this Rate
Schedule shall be at a mutually agreeable interconnection between Transporter's
facilities and
the
facilities of the upstream pipeline system providing service as shown in Exhibit A
to the FT-SG
Contract.
The total quantity specified at the Primary Receipt Point(s) must equal the sum of
the Contract
Demand
and Fuel and Losses requirement set forth in Section 8 of this Rate Schedule.
Transporter shall
not be
required under any circumstances to receive gas at any Receipt Point(s) where
the total quantity
of gas
scheduled for receipt on any Day is less than that required for the accurate
measurement of
quantities
to be received.
4.2 Delivery Points: The Primary Delivery Point(s) for all gas transported by
Transporter under
this
Rate Schedule shall be at a mutually agreeable interconnection between
Transporter's facilities
and the
facilities of Shipper or Shipper's designee as shown in Exhibit B to the FT-SG
Contract. The total
quantity specified at the Primary Delivery Point(s) must equal the Contract
Demand stated in the
FT-SG
Contract. Transporter shall not be required under any circumstances to deliver
gas at any
Delivery Point
where the total quantity of gas scheduled for delivery in any Day is less than that
required for the
accurate measurement of quantities to be delivered.