American Midstream (AlaTenn), LLC

Fifth Revised Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 05/01/2010, Docket: RP10-493-000, Status: Effective

Original Sheet No. 29 Original Sheet No. 29

 

RATE SCHEDULE FT (Continued)

 

5. RATE AND CHARGES

 

5.1 Applicable Rates: The applicable rates for service under the Rate Schedule

FT are the

applicable

Maximum Reservation and Commodity Rates shown on the effective Tariff

Sheet No. 4;

provided,

however, Transporter has the right at any and from time to time to adjust the

Maximum

Reservation and

Commodity Rates applicable to any service upon notice to Shipper to any level

not less than the

Minimum or more than the Maximum Reservation and Commodity Rates

established for this

Rate

Schedule and set forth on the effective Tariff Sheet No. 4.

 

Transporter shall file with the Commission the reports required under Section

284.7 of the

Commission's

Regulations for any adjustment below the maximum rates under this Rate

Schedule.

 

Authorized Overrun Quantities: Transportation by Transporter of Authorized

Overrun Quantities

shall be

at a rate equal to the current maximum applicable commodity rate for

Interruptible transportation

under

Rate Schedule IT.

 

5.2 New Facilities Charge: In addition to the charge pursuant to Section 5.1 of

this Rate

Schedule,

Transporter shall or may, at its option, subject to Shipper's prior agreement,

charge Shipper an

amount

to recoup the cost of facilities constructed at the Shipper's request in order to

provide

Transportation

Service under this Rate Schedule. Transporter shall not use the amounts so

collected in

establishing its

general system rates. The applicable New Facilities Charge shall be stated in the

FT Contract.

 

Transporter will construct only those facilities to render Transportation Services

hereunder which

interconnect with facilities that either cross or are immediately adjacent to

Transporter's existing

facilities; provided, however, Transporter shall not construct facilities hereunder

which will result

in the

expansion or diminishment of Transporter's mainline capacity or which

compromise the

operational

integrity of Transporter's pipeline system. Transporter will own and operate all

facilities

constructed

hereunder.