Dominion South Pipeline Co., LP
Original Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 12/16/2005, Docket: CP05- 77-001, Status: Effective
Original Sheet No. 1064 Original Sheet No. 1064 : Effective
GENERAL TERMS AND CONDITIONS
FERC ANNUAL CHARGE ADJUSTMENT
20. FERC ANNUAL CHARGE ADJUSTMENT
20.1 Purpose. For the purpose of funding of the Federal Energy Regulatory Commission's costs
incurred in any fiscal year, this Section establishes an annual charge adjustment
applicable to the Pipeline's transportation Rate Schedules as set forth on Sheet Nos. 50-69
of this FERC Gas Tariff.
20.2 Basis of the Annual Charge Adjustment. The Rate Schedules contained in this Tariff shall
include an increment for an Annual Charge Adjustment (ACA) for Federal Energy Regulatory
Commission costs. Such adjustment shall be the ACA unit charge, adjusted to the Pipeline's
pressure base and heating value, if required, which is specified by the Federal Energy
Regulatory Commission each year to recover its costs for its previous fiscal year. The ACA
shall be reflected on Sheet Nos. 50-69 of this Tariff. By electing the FERC ACA unit
charge method of recovery, Pipeline hereby acknowledges its intent not to recover any
annual charges recorded in FERC Account No. 928 in any general rate proceeding filed under
GT&C Section 4(e) of the Natural Gas Act.
20.3 Filing Procedure. The initial ACA or any subsequent changes in such charge shall be filed
by the Company at least 30 days prior to the proposed effective date, unless, for good
cause shown, a lesser notice period and different effective date is allowed by valid
Commission order. The proposed effective date of filings shall be October 1 of each
calendar year.