Effective Date: 10/01/2009, Docket: RP09-959-000, Status: Effective
Fourth Revised Sheet No. 51 Fourth Revised Sheet No. 51
Superseding: Third Revised Sheet No. 51
RATES APPLICABLE TO RATE SCHEDULES IN FERC GAS TARIFF, VOLUME NO. 1
(Rate per Dekatherm)
Overruns and Penalties
Rate Schedule Rate Notes
------------------------------------------------- ----------- -------------------
FT-1
Authorized Overrun Charge [1] $ 0.0123
Unauthorized Overrun Penalty (Non-Critical)[4] $ 0.0246
Unauthorized Overrun Penalty (Critical)[5] $25.0000 For penalty additions
see Footnote [2]
Scheduling Penalty [3] $ 0.0123
IT-1
Authorized Overrun Charge [1] $ 0.0123
Unauthorized Overrun Penalty (Non-Critical)[4] $ 0.0246
Unauthorized Overrun Penalty (Critical)[5] $25.0000 For penalty additions
see Footnote [2]
Scheduling Penalty [3] $ 0.0123
[1] This rate is equal to the currently effective IT-1 rate. See Section 37.1 of the GT&C.
[2] Add the gas price index for each Dt as described in Section 37.2 of the GT&C.
[3] This rate is equal to the currently effective IT-1 rate. See Section 37.3 of the GT&C.
[4] This rate is equal to twice the currently effective IT-1 rate. See Section 37.2 of the GT&C.
[5] See Section 37.2 of the GT&C.