Nautilus Pipeline Company, LLC
Original Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 04/05/2010, Docket: RP10-475-000, Status: Effective
Sixth Revised Sheet No. 174 Sixth Revised Sheet No. 174
Superseding: Fifth Revised Sheet No. 174
GENERAL TERMS AND CONDITIONS
22. SHIPPERS' RELEASE OF FIRM CAPACITY con't
(4) Releasing Shippers; Prearranged Release of Firm
Capacity For 31 Days or Less. A Releasing Shipper
under Rate Schedules FT-1, FT-2 or FT-3 who wishes to
release its firm capacity to a third party on a
temporary basis for a term of 31 Days or less may do
so without posting an offer for its firm capacity.
The minimum term for such release under Rate Schedule
FT-1 shall be one (1) contract Day and the term must
be for a consecutive number of Days within the same
Month. The Releasing Shipper and its Replacement
Shipper shall notify Transporter of the terms of the
Temporary Release. The Replacement Shipper must also
be prequalified pursuant to the requirements of
Section 22.4 below. Once the term of the release
hereunder has expired, the Releasing Shipper may not
rollover, extend or in any way continue a release of
capacity to the same Replacement Shipper under this
provision until twenty-eight (28) Days or more have
elapsed since the termination of the prearranged
release hereunder, with the exception of releases to
an AMA or to a participant in a state-approved retail
access program. Transporter shall post on its
Interactive Internet Website the terms of the release
entered into under this Section 22.3(b)(4) pursuant to
the provisions of Section 22.11.
(5) A Releasing Shipper under Rate Schedules FT-1, FT-2 or
FT-3 who wishes to temporarily release its firm
capacity on a prearranged basis to a third party for a
period in excess of 31 Days at a rate less than the
maximum filed rate for the respective Rate Schedule
shall post or have posted on Transporter's Internet
Web Site the terms and provisions under which the firm
capacity is proposed to be released for the purpose of
soliciting competitive bids. The minimum term of the
release shall be for a consecutive number of Days
greater than 31 Days.
(6) An open season is not required for: (a) a Prearranged
Release for the maximum charge applicable to the
capacity being released provided that the release term
is more than one Year; (b) a Short-term Prearranged
Release (31 Days or less; (c) a release to an asset
manager (AMA), as defined by FERC regulations at 18
CFR 284.8; or (d)releases to a marketer participating
in a state-regulated retail access program), as
defined by FERC regulations at 18 CFR 284.8.