Nautilus Pipeline Company, LLC

Original Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 04/05/2010, Docket: RP10-475-000, Status: Effective

Fourth Revised Sheet No. 151 Fourth Revised Sheet No. 151

Superseding: Third Revised Sheet No. 151

 

GENERAL TERMS AND CONDITIONS

 

 

14. DETERMINATION OF RECEIPTS AND DELIVERIES

 

14.1 Allocation of Actual Quantities at Point of Receipt

 

The responsibility for calculation and reporting of allocated

quantities should rest with the party responsible for accepting

NAESB allocation types. The party receiving nominations should

provide allocation statements.

 

(a) In the event Natural Gas from multiple Shippers is measured

by Transporter's meter at any Point of Receipt, all Shippers

delivering Natural Gas to Transporter at that Point of

Receipt shall provide, or cause to be provided, to

Transporter a predetermined allocation statement from its

seller(s) and/or third-party transporter(s)/ operator(s)

delivering Natural Gas to Transporter at that Point of

Receipt for the purpose of determining the quantity of

Natural Gas in Dth to be received by Transporter for the

account of Shipper at that Point of Receipt for the Day(s)

(and in the aggregate for the Month) for which Shipper has

made its nomination(s). The upstream party providing the

point confirmation should submit the predetermined

allocation to the allocating party after or during

confirmation and before start of gas Day.

 

(b) Except as provided in subsection 14.1(c), the predetermined

allocation statements provided for a Point of Receipt on

Transporter's Pipeline Facilities shall include:

 

(1) an allocation by the operator of the facilities

immediately upstream of Transporter's Point of Receipt

of the actual quantities of Natural Gas in Dth to be

received by Transporter which allocates each working

interest owner's Natural Gas from the production

source field(s) on each Day following the Day of gas

flow based on one and only one of the allocation

methodology types agreed upon as follows; ranked, pro

rata, percentage, swing or operator provided value.