Nautilus Pipeline Company, LLC

Original Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 12/01/1997, Docket: CP96-790-003, Status: Effective

Original Sheet No. 105 Original Sheet No. 105 : Effective

 

GENERAL TERMS AND CONDITIONS

 

 

5. MEASUREMENT & MEASUREMENT EQUIPMENT con't

 

(2) Any changes to the data to correct for

inaccuracies must be fully documented,

including assumptions and factors used in

calculating the adjustment.

 

(3) All event logs, alarm logs,

test/calibration reports, Natural Gas

analyses, preventive maintenance

documentation and any other document

containing EGM-related data.

 

All audit information will be available to Shipper's

personnel during Transporter's normal business hours, upon

request, in hard copy format and in an IBM compatible format.

 

5.9 Preservation of Records

 

Each party shall preserve for a period of at least two

(2) years, or such longer period as may be required by

the Federal Energy Regulatory Commission, all test

data, charts and other similar records.

 

5.10 Flow Control

 

Transporter shall control flow of Natural Gas into and

out of its Pipeline Facilities at all measurement

facilities, but may allow, at its sole option, the

following, if all of Transporter's operating standards

and requirements, including the requirements of Section

16 of Transporter's GT&C, are met: (a) third parties

to control flow into Transporter's Pipeline Facilities

and (b) third parties to control flow out of

Transporter's Pipeline Facilities, but Transporter

reserves the right to override the third party's flow

control equipment.