Nautilus Pipeline Company, LLC
Original Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 04/05/2010, Docket: RP10-475-000, Status: Effective
First Revised Sheet No. 99 First Revised Sheet No. 99
Superseding: Original Sheet No. 99
GENERAL TERMS AND CONDITIONS
5. MEASUREMENT & MEASUREMENT EQUIPMENT con't
5.5 Pressure Protection
Pressure regulation, pressure over-ride and pressure relief valve
or other pressure limiting devices installed and operated by
Transporter at the measuring station or near each interconnection
of Transporter's Pipeline Facilities with facilities of third
parties shall only be for the purpose of operation and protection
of Transporter's measurement equipment and Transporter's Pipeline
Facilities.
5.6 Test of Meters
The accuracy of Transporter's and Shipper's measurement equipment
shall be verified by Transporter and Shipper at reasonable
intervals and, if requested, in the presence of representatives of
Transporter and Shipper.
(a) Transporter and Shipper shall not be required to verify the
accuracy of orifice meter equipment more frequently than
once in any thirty (30) Day period.
(b) Transporter and Shipper shall not be required to verify the
accuracy of measurement equipment, other than orifice meter
equipment, more frequently than once in any ninety (90) Day
period, or in accordance with the requirements of the
agency(ies) having jurisdiction, or in accordance with
Shipper's Service Agreement, whichever of these requirements
is more stringent.
(c) Transporter and Shipper shall not be required to verify the
accuracy of the Natural Gas chromatograph or other heating
value measurement device more frequently than once in any
thirty (30) Day period.