Nautilus Pipeline Company, LLC
Original Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 04/05/2010, Docket: RP10-475-000, Status: Effective
First Revised Sheet No. 98 First Revised Sheet No. 98
Superseding: Substitute Original Sheet No. 98
GENERAL TERMS AND CONDITIONS
5. MEASUREMENT & MEASUREMENT EQUIPMENT con't
(b) Turbine meter installation shall conform to the
recommendations for design and installation contained in
Natural Gas Measurement Committee Report No. 7 of the AGA,
as published in 1981 and as such report may be further
revised.
(c) Positive displacement meter installation shall conform to
generally accepted engineering practices in the industry.
5.3 Access to Equipment and Records
Transporter and Shipper shall have the right to be present at the
time of any installing, reading, cleaning, changing, repairing,
inspecting, testing, calibrating or adjusting done in connection
with the other's equipment used in measuring receipts and
deliveries hereunder. The records from such measurement equipment
shall remain the property of their owner, but upon request each
will submit to the other its records and charts, together with
calculations therefrom, for inspection and verification, subject
to return within thirty (30) Days after receipt thereof.
5.4 Check Measurement Equipment
Shipper may install, operate, and maintain, at its own expense,
such check measurement equipment as it shall desire, provided that
such equipment shall be so installed as not to interfere with the
operation of other, including Transporter's, measurement equipment
immediately upstream of the Point(s) of Receipt. Transporter
shall have access to such check measurement equipment at all
reasonable hours, but the reading, calibrating, and adjusting
thereof and the changing of charts shall be done only by Shipper.