Garden Banks Gas Pipeline, LLC
Original Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 03/01/2009, Docket: RP09-328-001, Status: Effective
Second Revised Sheet No. 111 Second Revised Sheet No. 111
Superseding: First Revised Sheet No. 111
GENERAL TERMS AND CONDITIONS
(9) whether the offer is subject to a Prearranged
Release, if so, the name of the prearranged ACQUIRING
SHIPPER as well as whether the Prearranged Release is
to an asset manager (and, if so, with what supply
obligations) and/or whether the release is to a
marketer participating in a state-regulated retail
access program;
(10) any minimum acceptable reservation charge and whether
the RELEASING SHIPPER will accept bids on the
reservation charge converted to a volumetric rate
basis;
(11) if bids on a volumetric rate basis are acceptable,
whether the volume bid is a minimum daily throughput
commitment for billing purposes, i.e. the ACQUIRING
SHIPPER's monthly bill and the RELEASING SHIPPER's
monthly credit will be no less than the volume bid
multiplied by the volumetric rate bid multiplied by
the number of days in the month that the release was
in effect;
(12) whether bids may be submitted that are contingent on
(i) the award of upstream or downstream capacity on
another pipeline system, (ii) the success or failure
of another bid for capacity on Transporter's Facility
effective the same date/bid, or (iii) any other type
of contingency specified in the Offer, and the
deadline for removing any such contingencies.
(13) the economic criteria to be utilized by Transporter
in determining the "best bid" (said criteria to be
objectively stated, applicable to all bidders and
nondiscriminatory); and
(14) a nondiscriminatory tie breaker to be utilized in
determining the "best bid" in the event two or more
bids generate equal revenues.