Garden Banks Gas Pipeline, LLC
Original Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 06/01/1997, Docket: RP97-310-002, Status: Effective
Original Sheet No. 109A Original Sheet No. 109A : Effective
GENERAL TERMS AND CONDITIONS
(iii) A RELEASING SHIPPER should not be able to
specify an extension of the original bid
period or the pre-arranged deal match period,
without posting a new release.
(b) Minimum Posting Period: A RELEASING SHIPPER's
Offer shall be posted for a period to be
established by the RELEASING SHIPPER in its Offer
subject to the minimum requirements pursuant to
Section 19.9.