Garden Banks Gas Pipeline, LLC
Original Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 05/01/2000, Docket: RP00-272-000, Status: Effective
Third Revised Sheet No. 109 Third Revised Sheet No. 109 : Effective
Superseding: Second Revised Sheet No. 109
GENERAL TERMS AND CONDITIONS
19.6 Offer and Bid Procedures:
(a) Offer of Firm Capacity: A Shipper desiring to
release firm capacity pursuant to Section 19.3
shall post or have posted on Transporter's
Internet Web Site, in accordance with timelines in
Section 19.9 utilizing the Form of Capacity
Release, a complete offer of firm capacity (herein
called "Offer") except as provided otherwise in
subsection 19.3(d). Transporter shall date and
time stamp all Offers as they are received unless
the RELEASING SHIPPER specifies a time and date
for its Offer to be posted. In such event,
Transporter shall post the Offer at the time
specified by the RELEASING SHIPPER, provided that
such time does not conflict with the deadlines set
forth in Section 19.9. The RELEASING SHIPPER
agrees that its posted Offer specifically is
subject to the following conditions:
(i) In the event two or more RELEASING SHIPPERs
wish to combine Offers of capacity into one
Offer, the capacity must be released for the
same term and under the same conditions, and
each RELEASING SHIPPER, prior to the posting
of such an Offer, must notify Transporter in
writing or through Transporter's Interactive
Internet Website of the appointment of the
same agent for purposes of submitting a joint
Offer.
(ii) Once a RELEASING SHIPPER's Offer is posted,
it is considered binding and it may not be
withdrawn by the RELEASING SHIPPER during the
term of the posting period except where
unanticipated circumstances justify the
withdrawal of the Offer and no minimum bid
has been posted.