19. SHIPPERS RELEASE OF FIRM CAPACITY
19.3(d) Prearranged Release of Firm Capacity (cont'd):
(ii) A RELEASING SHIPPER who wishes to temporarily release its
firm capacity on a prearranged basis to a third party for a
period in excess of 31 days at a rate less than the maximum
filed rate for the respective Rate Schedule shall post or
have posted on Transporter's Internet Web Site the terms and
provisions under which the firm capacity is proposed to be
released for the purpose of soliciting competitive bids.
The minimum term of the release shall be for a consecutive
number of days greater than 31 days.
(iii) An open season is not required for: (a) a Prearranged
Release for the maximum charge applicable to the capacity
being released provided that the release term is more than
one Year; (b) a Short-term Prearranged Release (31 Days or
less; (c) a release to an asset manager (AMA), as defined by
FERC regulations at 18 CFR 284.8; or (d)releases to a
marketer participating in a state-regulated retail access
program), as defined by FERC regulations at 18 CFR 284.8.