Garden Banks Gas Pipeline, LLC

Original Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 05/10/2010, Docket: RP10-594-000, Status: Effective

Fifth Revised Sheet No. 79 Fifth Revised Sheet No. 79

Superseding: Fourth Revised Sheet No. 79

 

GENERAL TERMS AND CONDITIONS

 

11. NOMINATIONS

 

11.1 Nomination Procedures:

 

(a) General: Shipper shall nominate gas for transportation

under its Transportation Service Agreement(s) by

notifying Transporter, via Transporter's Interactive

Internet Website or by calling 1-800-428-3676 and

following with a facsimile by 9:00 a.m. the next Business

Day. A valid nomination includes the daily quantity of

gas it has available for transportation at each Receipt

Point and of the quantity of gas it desires to have

delivered at each Delivery Point, expressed in Dth. All

nominations should be considered original nominations and

should be replaced to be changed. When a nomination for

a date range is received, each day within the range is

considered an original nomination. When a subsequent

nomination is received for one or more days within that

range, the previous nomination is superseded by the

subsequent nomination only to the extent of the days

specified. The days of the previous nomination outside

the range of the subsequent nomination are unaffected.

Nominations have a prospective effect only.

 

Transporter shall not be obligated to accept nominations

in excess of the MDDQ at each Delivery Point multiplied

by the Shipper Specific Heating Value for the specific

month. Shipper shall be entitled to nominate at each

Receipt Point a quantity of gas in excess of the MDRQ

multiplied by the Shipper Specific Heating Value for the

specific month equal to Shipper's pro rata share of lost-

and-unaccounted-for gas. Notwithstanding the above, the

quantity contained in a valid Imbalance make-up

nomination or Authorized Overrun nomination when combined

with the quantities contained in the other nominations

made by Shipper at the same Receipt and/or Delivery Point

may cause the MDRQ and/or MDDQ of a specific

Receipt/Delivery Point to be exceeded.