Garden Banks Gas Pipeline, LLC
Original Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 04/16/1997, Docket: CP96-678-001, Status: Effective
Original Sheet No. 36 Original Sheet No. 36 : Effective
RATE SCHEDULE IT-1
INTERRUPTIBLE TRANSPORTATION SERVICE
6.4 Modification of Service
Any modification of existing transportation service under Rate
Schedule IT-1 shall be requested by Shipper's submission of a
new Service Request Form included in Transporter's FERC Gas
Tariff with a notation on the form that the service requested
is a modification of an existing service. Such modification
shall be effective after the Service Request Form has been
fully processed and accepted by Transporter.
7. GENERAL TERMS AND CONDITIONS
Shipper shall provide Transporter with such information as is needed
to meet the requirements placed on Transporter pursuant to 18 CFR
Part 284. The General Terms and Conditions specified in Volume No. 1
of Transporter's FERC Gas Tariff are incorporated as part of this
Rate Schedule.