Garden Banks Gas Pipeline, LLC
Original Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 12/15/2005, Docket: RP06- 94-000, Status: Effective
Second Revised Sheet No. 35 Second Revised Sheet No. 35 : Effective
Superseding: Original Sheet No. 35
RATE SCHEDULE IT-1
INTERRUPTIBLE TRANSPORTATION SERVICE
6.4 Modification of Service
Any modification of existing transportation service
under Rate Schedule IT-1 shall be requested by
Shipper's submission of a new Service Request Form
included in Transporter's FERC Gas Tariff with a
notation on the form that the service requested is a
modification of an existing service. Such modification
shall be effective after the Service Request Form has
been fully processed and accepted by Transporter.
7. GENERAL TERMS AND CONDITIONS
Shipper shall provide Transporter with such information as is
needed to meet the requirements placed on Transporter pursuant
to 18 CFR Part 284. The General Terms and Conditions specified
in Volume No. 1 of Transporter's FERC Gas Tariff are
incorporated as part of this Rate Schedule.