Garden Banks Gas Pipeline, LLC
Original Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 05/10/2010, Docket: RP10-594-000, Status: Effective
Fifth Revised Sheet No. 14 Fifth Revised Sheet No. 14
Superseding: Fourth Revised Sheet No. 14
RATE SCHEDULE FT-1
FIRM TRANSPORTATION SERVICE
capacity to render the service is available; provided, however, if
construction of facilities (whether pipeline or production) is
required, the request may be made at a date not earlier than three
(3) years prior to the effective date of the Transportation
Service Agreement.
All completed Service Request Forms are to be sent to:
Garden Banks Gas Pipeline, LLC
1100 Louisiana, Suite 3300
Houston, Texas 77002
Attention: Contract Administration
6.2 A request for transportation service must include the following:
(a) Gas Quantities: The maximum daily quantity applicable to
each Receipt Point(s) and Delivery Point(s) stated in Mcf
and Dth and the estimated total quantities to be received
and transported over the delivery period.
(b) Receipt/Delivery Point(s): The designated Receipt Point(s)
and Delivery Point(s) for the requested transportation
together with the name of the entity delivering gas to
Transporter and the name of the entity to receive the gas
from Transporter.
(c) Term: The proposed commencement and termination dates of
service.
(d) Shipper Certification: A statement by the Shipper
certifying that all necessary upstream and downstream
arrangements will be in place on the date the transportation
service is to commence and that Shipper will have title to
the gas to be delivered to Transporter.
(e) Facilities: Identification and location of any facilities
to be constructed or installed by any party affected by the
proposed transportation service.