Egan Hub Storage, LLC
First Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 02/01/2009, Docket: RP09-160-000, Status: Effective
Third Revised Sheet No. 60 Third Revised Sheet No. 60
Superseding: Second Revised Sheet No. 60
ILS RATE SCHEDULE
INTERRUPTIBLE LOAN SERVICE
1. AVAILABILITY
This rate schedule is available to any Customer for the purchase of Interruptible loan
service from Egan Hub, provided that:
(a) Egan Hub has determined that it has sufficient operationally available
storage capacity, injection or withdrawal capacity, or that it is willing to construct
capacity, to perform the service requested by Customer;
(b) Egan Hub has determined that the service requested by Customer will not
interfere with the efficient operation of its system and will not cause a reduction in Egan
Hub's ability to provide higher priority services;
(c) Customer accepts responsibility for arranging any transportation service
required for utilization of the service provided under this rate schedule, and such
arrangements must be compatible with Egan Hub's system operations; and
(d) Customer and Egan Hub have executed a Hub Services Agreement and related
Exhibit(s) A and Exhibit(s) B.
(e) In no event shall Egan Hub be required to construct, modify, expand or
acquire any facilities to enable Egan Hub to perform the requested services.
2. APPLICABILITY AND CHARACTER OF SERVICE
2.1 This rate schedule shall apply to all Interruptible loan service rendered by Egan
Hub to Customer at Egan Hub's facilities located in Acadia Parish, Louisiana pursuant to an
executed Exhibit B to Customer's Hub Services Agreement.
2.2 Interruptible loan service rendered by Egan Hub to Customer under this rate
schedule shall consist of:
(a) the advancement by Egan Hub to Customer, upon nomination and subsequent
confirmation, of daily quantities of Gas up to the Maximum Daily Withdrawal Quantity ("MDWQ")
stated in Exhibit B of Customer's Hub Services Agreement, less applicable Fuel Reimbursement,
provided that (i) all higher priority service nominations for withdrawal have been satisfied
and system needs allow, and (ii) Customer's Loan Balance is less than the Maximum Loan Quantity
set forth in Exhibit B of Customer's Hub Services Agreement; and
(b) the return by Customer to Egan Hub, upon nomination and subsequent
confirmation, of the borrowed quantities of Gas up to the Maximum Daily Injection Quantity
("MDIQ") stated in Exhibit B of Customer's Hub Services Agreement, provided that all higher
priority nominations for injections have been satisfied, and Customer delivers the nominated
quantity, plus applicable Fuel Reimbursement, to the Point(s) of Receipt, at a time to be
agreed upon as stated in Exhibit B to Customer's Hub Services Agreement.
2.3 If Customer fails to return the quantities advanced by Egan Hub to Customer under
this rate schedule at the agreed upon time stated in the applicable Exhibit B of Customer's Hub
Services Agreement, Egan Hub may purchase replacement Gas and Customer shall pay Egan Hub the
cost of the replacement Gas, which includes the actual cost of replacement supplies and any
costs or penalties incurred by Egan Hub or its Customers as a result of Customer's failure to
deliver replacement Gas, plus any applicable Fuel Reimbursement and Interruptible Loan
Injection Charges and all other costs incurred by Egan Hub to secure such replacement Gas,
including, but not limited