Hardy Storage Company, LLC
Original Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 04/01/2007, Docket: CP05-150-003, Status: Effective
Original Sheet No. 82 Original Sheet No. 82 : Effective
GENERAL TERMS AND CONDITIONS (Cont’d)
6.4 Customer's Notice of Changes. Except for reasons of force majeure, as
described at Section 15 (Force Majeure) of the General Terms and Conditions,
Customer shall notify Seller or cause Seller to be notified (via Seller's
EBB) at least 24 hours in advance of any anticipated material change in the
daily quantity of gas Customer desires to deliver or to cause to be
delivered to Seller under Seller's Rate Schedules. If an unanticipated or a
force majeure event causes a material change in the quantity of gas Customer
will deliver or cause to be delivered to Seller, Customer shall notify or
cause Seller to be notified as soon as possible after occurrence of that
event. In the event of such material changes, Customer shall tender or
cause to be tendered to Seller such estimated daily quantities at flow rates
as close as possible to uniform hourly rates. Departures by Customer from
the daily quantities that it has notified Seller it intends to tender to
Seller under a Rate Schedule shall be kept to a minimum and in no event
shall exceed the amount permitted by operating conditions.
6.5 Scheduling Under Individual Rate Schedules. To the extent that
individual Rate Schedules set forth nomination scheduling requirements
inconsistent with the requirements set forth in this Section, the applicable
Rate Schedules are controlling and Customer shall satisfy the requirements
set forth in those Rate Schedules. To the extent that applicable Rate
Schedules set forth scheduling requirements in addition to, but not
inconsistent with, the provisions of this Section, Customer shall satisfy
the requirements of both the individual Rate Schedules and this Section.