Hardy Storage Company, LLC
Original Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 04/01/2007, Docket: CP05-150-003, Status: Effective
Original Sheet No. 42 Original Sheet No. 42 : Effective
GENERAL TERMS AND CONDITIONS (cont’d.)
1. DEFINITIONS (cont’d)
1.8 "Cubic Foot" and "Standard Cubic Foot" shall mean that quantity
of natural gas that occupies one cubic foot of volume at the Volumetric
Measurement Base defined in Section 26.2 of the General Terms and
Conditions.
1.9 "Designated Site" shall mean the electronic address used to
contact an entity for EDI transmission.
1.10 "Dth (Dekatherm)" shall mean one million Btu. The standard
quantity for nominations, confirmation and scheduling is dekatherms per
gas day in the United States, and gigajoules per gas day in Canada and
gigacalories per gas day in Mexico. (For reference 1 dekatherm =
1,000,000 Btu's; and 1 gigajoule = 1,000,000,000 joules; and 1
gigacalorie = 1,000,000,000 calories.) For commercial purposes, the
standard conversion factor between dekatherms and gigajoules is
1.055056 gigajoules per dekatherm and between dekatherms and
gigacalories is 0.251996 gigacalories per dekatherm. The standard Btu
is the International Btu, which is also called the Btu(IT); the
standard joule is the joule specified in the SI system of units.
1.11 "Electronic Bulletin Board" and "EBB" shall mean Seller's
computerized system for the posting, sending and receiving of notices
and other communications under this Tariff.
1.12 “Electronic Notice Delivery” is the term used to describe the
delivery of notices via Internet E-mail and/or EDI/EDM.
1.13 "EDI" shall mean electronic data interchange as defined by the
standards established by the North American Energy Standards Board
(NAESB) and approved by the Commission, or Seller defined data sets
where no NAESB standard exists.
1.14 "Elapsed-prorated-capacity" shall mean that portion of the
capacity that would have theoretically been available for use prior to
the effective time of the intraday recall based upon a cumulative
uniform hourly use of the capacity.
1.15 “Elapsed-prorated-scheduled quantity” shall mean that portion of
the scheduled quantity that would have theoretically flowed up to the
effective time of the intraday nomination being confirmed, based upon a
cumulative uniform hourly quantity for each nomination period affected.
1.16 "Electronic Measurement" shall mean that form of measurement
consisting of flow computers or computerized Remote Terminal Units
(RTUs), electronic transducers, and associated power, data
communications, and other electronic equipment to accomplish the
measurement of gas and transfer of data without the use of charts or
other paper Recordings.