Tres Palacios Gas Storage LLC
Original Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 08/01/2008, Docket: RP08-424-000, Status: Effective
Original Sheet No. 117 Original Sheet No. 117
GENERAL TERMS AND CONDITIONS
(Continued)
TRES PALACIOS will issue a contract within one hour of the award
posting (with a new contract number, when applicable).
Nominations for Gas flow are possible beginning at the next
available nomination cycle for the effective date of the contract.
Such nominations will be processed in accordance with the
nomination and scheduling requirements of Section 8 of the General
Terms and Conditions; however, in no circumstance will Gas flow
prior to the effective date of the release as specified in
Releasing Customer's offer.
(b) For standard releases of one year or longer:
- Offers shall be tendered by 12:00 p.m. CCT four Business Days
before the award;
- The bid period shall end at 1:00 p.m. CCT on the Day before
timely nominations are due (open season is three Business Days) or
at 1:00 p.m. CCT on any subsequent Business Day as specified in
Releasing Customer's offer, whichever is elected by Releasing
Customer;
- Evaluation period begins at 1:00 p.m. CCT on the Day the bid
period ends, during which contingency is eliminated, determination
of best bid is made, and ties are broken;
- Evaluation period ends and award is posted if no match is
required at 2:00 p.m. CCT the same Day;
- If the Prearranged Replacement Customer's bid is not the "best
bid," TRES PALACIOS shall allow such Prearranged Replacement
Customer a Matching Period of thirty (30) minutes from 2:00 p.m.
CCT until 2:30 p.m. CCT on the Day the Bid Period ends, or such
later time as specified in the Releasing Customer's offer, to
determine whether to match the "best bid" and to notify TRES
PALACIOS of its decision.
- If a match is required, the award will be posted by 3:00 p.m.
CCT.
TRES PALACIOS will issue a contract within one hour of the award
posting (with a new contract number, when applicable).
Nominations for Gas flow are possible beginning at the next
available nomination cycle for the effective date of the contract.
Such nominations will be processed in accordance with the
nomination and scheduling requirements of Section 8 of the General
Terms and Conditions; however, in no circumstance will Gas flow
prior to the effective date of the release as specified in
Releasing Customer's offer.
(c) Timeline for Non-standard Releases. If Customer
specifies a bid evaluation methodology other than those stated in
Section 4.7 or specifies any special terms or conditions, the
above timelines shall apply; provided, however, one additional
Business Day will be added to the evaluation period. Subsequent
deadlines will be delayed by such additional Business Day, causing
Gas flow to occur at least one Day later than under the standard
timelines set forth in Sections 4.3(a) and 4.3(b).