Northern Natural Gas Company
Fifth Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 11/01/2009, Docket: RP09-569-000, Status: Pending
31 Revised Sheet No. 54 31 Revised Sheet No. 54
Superseding: 30 Revised Sheet No. 54
R A T E S C H E D U L E S T F, T F X, L F T, G S - T, T I, & F D D
Fuel Percentages/Electric Compression Rates
Percentages
-----------
FUEL PERCENTAGES: 1/
Market Area (including Out-of-Balance) 1.49%
Field Area 2/ 3/ 5/ 6/
UNACCOUNTED FOR PERCENTAGE (including Out-of-Balance) 0.32% 4/ 5/
FDD Storage Fuel 0.91%
Electric Compression
--------------------
COMMODITY RATES: 1/
Market Area $0.0003
Field Area $0.0000
1/ Northern will adjust its Fuel percentages and electric compression commodity
rates in accordance with Sections 53A and 53B, respectively, of the General
Terms and Conditions of this Tariff.
2/ Fuel shall be determined by Mileage Indicator Districts (MIDS) for the Field
Area.
3/ Fuel charged in the Field and Market Areas for a pooling transaction or for
processing plant transactions will not exceed the fuel charged on a unified
Field-to-Market transaction having the same initial Field receipt point and
ultimate Market delivery point, i.e., the total fuel collected for
transactions that go into and out of pooling points or processing plants in
either the Field Area or the Market Area will be no greater than the fuel
collected on the total path between the original receipt point and the
ultimate delivery point, subject to the shipper(s) providing Northern the
requisite information.
4/ The Unaccounted For percentage utilizes the most recent twelve-month period
ending December 31.
5/ Sheet No. 54A identifies the specific transportation transactions exempt
from fuel and unaccounted-for retention charges.
6/ The Out-of-Balance Fuel Percentage for deliveries in MIDS 1-7 shall be the
applicable Section 1 Mainline Fuel percentage, and for deliveries in
MIDS 8-16B shall be the applicable Section 2 Mainline Fuel percentage.
In the event facilities have been abandoned, Northern shall have the right to file to
reduce the applicable MID fuel percentage(s) on a common basis for all transactions
affected by the abandonment to reflect the reduction in use for the remainder of the
PRA period. In the event such abandoned facilities (gas compressors) have been
replaced with electric compressors installed after October 1, 1998, and Northern
reduces the applicable MID fuel percentages, Northern has the right to file to
increase the applicable electric compression commodity rate.