| Reliability Standard |
Title |
Status |
Approval date |
Note: Links below are to external PDF files that are maintained by NERC at NERC’s Reliability Standards site  |
| BAL-001-0 |
Real Power Balancing Control Performance |
Approved |
March 15, 2007 |
| BAL-002-0 |
Disturbance Control Performance |
Approved; direct modification |
March 15, 2007 |
| BAL-003-0 |
Frequency Response and Bias |
Approved; direct modification |
March 15, 2007 |
| BAL-004-0 |
Time Error Correction |
Approved; direct modification |
March 15, 2007 |
| BAL-005-0 |
Automatic Generation Control |
Approved; direct modification |
March 15, 2007 |
| BAL-006-1 |
Inadvertent Interchange |
Approved; direct modification |
March 15, 2007 |
| CIP-001-1 |
Sabotage Reporting |
Approved; direct modification |
March 15, 2007 |
| COM-001-1 |
Telecommunications |
Approved; direct modification |
March 15, 2007 |
| COM-002-2 |
Communications and Coordination |
Approved; direct modification |
March 15, 2007 |
| EOP-001-0 |
Emergency Operations Planning |
Approved; direct modification |
March 15, 2007 |
| EOP-002-2 |
Capacity and Energy Emergencies |
Approved; direct modification |
March 15, 2007 |
| EOP-003-1 |
Load Shedding Plans |
Approved; direct modification |
March 15, 2007 |
| EOP-004-1 |
Disturbance Reporting |
Approved; direct modification |
March 15, 2007 |
| EOP-005-1 |
System Restoration Plans |
Approved; direct modification |
March 15, 2007 |
| EOP-006-1 |
Reliability Coordination - System Restoration |
Approved; direct modification |
March 15, 2007 |
| EOP-007-0 |
Establish, Maintain, and Document a Regional Blackstart Capability Plan |
Pending |
|
| EOP-008-0 |
Plans for Loss of Control Center Functionality |
Approved; direct modification |
March 15, 2007 |
| EOP-009-0 |
Documentation of Blackstart Generating Unit Test Results |
Approved |
March 15, 2007 |
| FAC-001-0 |
Facility Connection
Requirements |
Approved |
March 15, 2007 |
| FAC-010-2 |
System Operating Limits Methodology for the Planning Horizon |
Approved |
March 20, 2009 |
| FAC-002-0 |
Coordination of Plans
for New Facilities |
Approved; direct modification |
March 15, 2007 |
| FAC-003-1 |
Transmission Vegetation Management Program |
Approved; direct modification |
March 15, 2007 |
| FAC-004-0 |
Methodologies
for Determining Electrical Facility Ratings |
Withdrawn |
|
| FAC-005-0 |
Electrical
Facility Ratings for System Modeling |
Withdrawn |
|
| FAC-008-1 |
Facility Ratings Methodology |
Approved; direct modification |
March 15, 2007 |
| FAC-009-1 |
Establish and
Communicate Facility Ratings |
Approved |
March 15, 2007 |
| FAC-010-1 |
System Operating Limits Methodology for the Planning Horizon |
Approved |
December 20, 2007 |
| FAC-011-1 |
System Operating Limits Methodology for the Operations Horizon |
Approved; direct modification |
December 20, 2007 |
| FAC-011-2 |
System Operating Limits Methodology for the Operations Horizon |
Approved |
March 20, 2009 |
| FAC-012-1 |
Transfer Capabilities
Methodology |
Pending |
|
| FAC-013-1 |
Establish and
Communicate Transfer Capabilities |
Approved; direct modification |
March 15, 2007 |
| FAC-014-1 |
Establish and Communicate System Operating Limits |
Approved |
December 20, 2007 |
| FAC-014-2 |
Establish and Communicate System Operating Limits |
Approved |
March 20, 2009 |
| INT-001-3 |
Interchange Transaction Tagging |
Approved; modified on July 21, 2008 |
March 15, 2007 |
| INT-002-0 |
Interchange Transaction Tag Communication and Assessment |
Withdrawn |
|
| INT-003-2 |
Interchange Transaction Implementation |
Approved; modified on July 21, 2008 |
March 15, 2007 |
| INT-004-2 |
Interchange Transaction Modifications |
Approved; modified on July 21, 2008 |
March 15, 2007 |
| INT-005-2 |
Interchange Authority Distributes Arranged Interchange |
Approved; modified on July 21, 2008 |
March 15, 2007 |
| INT-006-2 |
Response to Interchange Authority |
Approved; modified on July 21, 2008 |
March 15, 2007 |
| INT-007-1 |
Interchange Confirmation |
Approved |
March 15, 2007 |
| INT-008-2 |
Interchange Authority Distributes Status |
Approved; modified on July 21, 2008 |
March 15, 2007 |
| INT-009-1 |
Implementation of Interchange |
Approved |
March 15, 2007 |
| INT-010-1 |
Interchange Coordination Exceptions |
Approved |
March 15, 2007 |
| IRO-001-1 |
Reliability Coordination – Responsibilities and Authorities |
Approved; direct modification |
March 15, 2007 |
| IRO-002-1 |
Reliability Coordination – Facilities |
Approved; direct modification |
March 15, 2007 |
| IRO-003-2 |
Reliability Coordination – Wide Area View |
Approved; direct modification |
March 15, 2007 |
| IRO-004-1 |
Reliability Coordination - Operations Planning |
Approved; direct modification |
March 15, 2007 |
| IRO-005-1 |
Reliability Coordination – Current Day Operations |
Approved; direct modification |
March 15, 2007 |
| IRO-006-3 |
Reliability Coordination – Transmission Loading Relief |
Approved; direct modification |
March 15, 2007 |
| IRO-014-1 |
Procedures,
Processes, or Plans to Support Coordination Between
Reliability Coordinators |
Approved |
March 15, 2007 |
| IRO-015-1 |
Notifications
and Information Exchange Between Reliability Coordinators |
Approved |
March 15, 2007 |
| IRO-016-1 |
Coordination
of Real-time Activities Between Reliability Coordinators |
Approved |
March 15, 2007 |
| MOD-001-0 |
Documentation of TTC and ATC Calculation Methodologies |
Pending |
|
| MOD-002-0 |
Review of TTC and ATC Calculations and Results |
Pending |
|
| MOD-003-0 |
Procedure for Input on TTC and ATC Methodologies and Values |
Pending |
|
| MOD-004-0 |
Documentation of Regional CBM Methodologies |
Pending |
|
| MOD-005-0 |
Procedure for Verifying CBM Values |
Pending |
|
| MOD-006-0 |
Procedures for Use of CBM Values |
Approved; direct modification |
March 15, 2007 |
| MOD-007-0 |
Documentation of the Use of CBM |
Approved; direct modification |
March 15, 2007 |
| MOD-008-0 |
Documentation and Content of Each Regional TRM Methodology |
Pending |
|
| MOD-009-0 |
Procedure for Verifying TRM Values |
Pending |
|
| MOD-010-0 |
Steady-State Data for Transmission System Modeling and Simulation |
Approved; direct modification |
March 15, 2007 |
| MOD-011-0 |
Regional Steady-State Data Requirements and Reporting Procedures |
Pending |
|
| MOD-012-0 |
Dynamics Data for Transmission System Modeling and Simulation |
Approved; direct modification |
March 15, 2007 |
| MOD-013-1 |
RRO Dynamics Data Requirements and Reporting Procedures |
Pending; direct modification |
|
| MOD-014-0 |
Development of Interconnection-Specific Steady State System Models |
Pending |
|
| MOD-015-0 |
Development of Interconnection-Specific Dynamics System Models |
Pending |
|
| MOD-016-1 |
Actual and Forecast Demands, Net Energy for Load, Controllable DSM |
Approved; direct modification |
March 15, 2007 |
| MOD-017-0 |
Aggregated Actual and Forecast Demands and Net Energy for Load |
Approved; direct modification |
March 15, 2007 |
| MOD-018-0 |
Reports of Actual and Forecast Demand Data |
Approved |
March 15, 2007 |
| MOD-019-0 |
Forecasts of Interruptible Demands and DCLM Data |
Approved; direct modification |
March 15, 2007 |
| MOD-020-0 |
Providing Interruptible Demands and DCLM Data |
Approved; direct modification |
March 15, 2007 |
| MOD-021-0 |
Accounting Methodology for Effects of Controllable DSM in Forecasts |
Approved; direct modification |
March 15, 2007 |
| MOD-024-1 |
Verification of Generator Gross and Net Real Power Capability |
Pending |
|
| MOD-025-1 |
Verification of Generator Gross and Net Reactive Power Capability |
Pending |
|
| NUC-001-1 |
Nuclear Plant Interface Coordination |
Approved |
October 16, 2008 |
| PER-001-0 |
Operating Personnel Responsibility and Authority |
Approved |
March 15, 2007 |
| PER-002-0 |
Operating Personnel Training |
Approved; direct modification |
March 15, 2007 |
| PER-003-0 |
Operating Personnel Credentials |
Approved; direct modification |
March 15, 2007 |
| PER-004-1 |
Reliability Coordination – Staffing |
Approved; direct modification |
March 15, 2007 |
| PRC-001-1 |
System Protection Coordination |
Approved; direct modification |
March 15, 2007 |
| PRC-002-1 |
Define and Document Disturbance Monitoring Equipment Requirements |
Pending |
|
| PRC-003-1 |
Regional
Requirements for Analysis of Misoperations of Transmission
and Generation Protection Systems |
Pending |
|
| PRC-004-1 |
Analysis and Mitigation of Transmission and Generation Protection System Misoperations |
Approved |
March 15, 2007 |
| PRC-005-1 |
Transmission and Generation Protection System Maintenance and Testing |
Approved; direct modification |
March 15, 2007 |
| PRC-006-0 |
Development and Documentation of Regional UFLS Programs |
Pending |
|
| PRC-007-0 |
Assuring Consistency with Regional UFLS Program |
Approved |
March 15, 2007 |
| PRC-008-0 |
Underfrequency Load Shedding Equipment Maintenance Programs |
Approved; direct modification |
March 15, 2007 |
| PRC-009-0 |
UFLS Performance Following an Underfrequency Event |
Approved |
March 15, 2007 |
| PRC-010-0 |
Assessment of the Design and Effectiveness of UVLS Program |
Approved; direct modification |
March 15, 2007 |
| PRC-011-0 |
UVLS System Maintenance and Testing |
Approved; direct modification |
March 15, 2007 |
| PRC-012-0 |
Special Protection System Review Procedure |
Pending |
|
| PRC-013-0 |
Special Protection System Database |
Pending |
|
| PRC-014-0 |
Special Protection System Assessment |
Pending |
|
| PRC-015-0 |
Special Protection System Data and Documentation |
Approved |
March 15, 2007 |
| PRC-016-0 |
Special Protection System Misoperations |
Approved; direct modification |
March 15, 2007 |
| PRC-017-0 |
Special Protection System Maintenance and Testing |
Approved; direct modification |
March 15, 2007 |
| PRC-018-1 |
Disturbance Monitoring Equipment Installation and Data Reporting |
Approved |
March 15, 2007 |
| PRC-020-1 |
Under-Voltage Load Shedding Program Database |
Pending |
|
| PRC-021-1 |
Under-Voltage Load Shedding Program Data |
Approved |
March 15, 2007 |
| PRC-022-1 |
Under-Voltage Load Shedding Program Performance |
Approved |
March 15, 2007 |
| TOP-001-1 |
Reliability Responsibilities and Authorities |
Approved; direct modification |
March 15, 2007 |
| TOP-002-2 |
Normal Operations Planning |
Approved; direct modification |
March 15, 2007 |
| TOP-003-0 |
Planned Outage Coordination |
Approved; direct modification |
March 15, 2007 |
| TOP-004-1 |
Transmission Operations |
Approved; direct modification |
March 15, 2007 |
| TOP-005-1 |
Operational Reliability Information |
Approved; direct modification |
March 15, 2007 |
| TOP-006-1 |
Monitoring System Conditions |
Approved; direct modification |
March 15, 2007 |
| TOP-007-0 |
Reporting SOL and IROL Violations |
Approved |
March 15, 2007 |
| TOP-008-1 |
Response to Transmission Limit Violations |
Approved; direct modification |
March 15, 2007 |
| TPL-001-0 |
System Performance Under Normal Conditions |
Approved; direct modification |
March 15, 2007 |
| TPL-002-0 |
System Performance Following Loss of a Single BES Element |
Approved; direct modification |
March 15, 2007 |
| TPL-003-0 |
System Performance Following Loss of Two or More BES Elements |
Approved; direct modification |
March 15, 2007 |
| TPL-004-0 |
System Performance Following Extreme BES Events |
Approved; direct modification |
March 15, 2007 |
| TPL-005-0 |
Regional and Interregional Self-Assessment Reliability Reports |
Pending |
|
| TPL-006-0 |
Assessment Data from Regional Reliability Organizations |
Pending |
|
| VAR-001-1 |
Voltage and Reactive Control |
Approved; direct modification |
March 15, 2007 |
| VAR-002-1 |
Generator Operations for Maintaining Network Voltage Schedules |
Approved |
March 15, 2007 |
| Glossary |
Glossary of Terms Used in Reliability Standards |
Approved; direct modification |
March 15, 2007 |
| Regional Difference |
BAL-001:ERCOT:CPS2 |
Approved; direct modification |
March 15, 2007 |
| Regional Difference |
INT-001/4: WECC Tagging Dynamic Schedules and Inadvertent Payback |
Withdrawn |
|
| Regional Difference |
BAL-006: MISO RTO inadvertent Interchange Accounting |
Approved |
March 15, 2007 |
| Regional Difference |
BAL-006: MISO/SPP Financial Inadvertent Settlement |
Approved |
March 15, 2007 |
| Regional Difference |
INT-003: MISO/SPP Scheduling Agent |
Approved |
March 15, 2007 |
| Regional Difference |
INT-003: MISO Enhanced Scheduling Agent |
Approved |
March 15, 2007 |
| Regional Difference |
INT-001/3:MISO Energy Flow Information |
Approved |
March 15, 2007 |
| Regional Difference |
IRO-006: PJM/MISO/SPP Enhanced Congestion Management |
Pending |
|